Its a good 2 days if not more, the bake takes a real long time, and then if there is issues, which there always is, then add another day or 2. We have the 1st build of 5.4 almost ready for push but other 'paid' projects have got in the way. It will drop real soon. DLSS will be on this build, followed by FSR