One constructive criticism I have is that sometimes I'm trying to set a job to max priority that didn't already have a high priority and there are a lot of the jobs so I have to click a ton to get it all the way to max priority. Maybe there could be two new buttons next to the preexisting ones that takes the job priority all the way to max and one that takes it all the way to zero?