FINAL LOG
Decided to scrap my prototype, additional work hours has made it difficult to properly plan anything and with the time I have left I won't be able to put out something i'm ok with. Doing the jam did help a lot with figuring out the direction of the project however so i'm still going to work on it, just on my own time!