Thanks for your response.
Knowing that I have 4 waste processors and hazmeeps working, will biomass accumulate with all bathrooms and waste bins connected to ejectors?
I'm looking for feedback on how to deal with out-of-control toxic gases from building a waste processor, assigning a Hazmeep, then removing waste pipes from waste ejector so that all waste goes to waste processor to produce biomass. All was going well, until I unassigned the Hazmeep. Then all hell broke out with toxic gases.
To combat this, I assigned 5 Hazmeeps to no avail. I can't remove the toxic gases even after reconnecting the waste ejectors to the bathrooms and waste bins.
Help??